Western European Energy Producer

Customer Challenge

Provide grid support and improve ROI through coordination of multi-site wind farms

GE's Solution

The energy producer manages multiple wind farms, totaling more than 100MW of power. GE's GridNode's DER management system provided them with:

  • Voltage, reactive power and power factor dispatch at POI
  • Equitable dispatch with consideration for network limits
  • OLTC control
  • Integrated network parameters, DER capability curves, thermal and voltage limits

Customer Benefits

Increased revenues through reactive power services as well as improved asset life through volt/VAR control.

Book a Demo