High Voltage Direct Current Systems
 
White Papers/Case Study

File NameTitleRevision DateFormat
DolWin3Case Study: DolWin3 HVDC Voltage Source Converters for Efficient Connection of Renewable Energy05/04/2018 [425k]
Work to complete the DolWin3 grid connection is proceeding at full speed so that the connection can be brought online in 2018.
PEA-0577Case Study: Buk-Dangjin - Godeok HVDC05/04/2018 [254k]
Case study on transmitting power at the heart of a densely populated city using HVDC
PEA-0572Case Study: IFA 2000 France – UK HVDC transmission link05/04/2018 [845k]
Case study on the cross-channel IFA 2000 transmission link
PEA-0575Case Study: Champa ±800 kV HVDC Delivering Efficient Energy Highways in India 05/04/2018 [779k]
In 2012, GE was awarded a turnkey project for the transfer of 3,000 MW from Champa in central India to Kurukshetra in northern India
PEA-1641Case Study: Piedmont-Savoy HVDC Line 05/15/2018 [469k]
A New Power Highway Through The Alps To Build Europe’s Energy Grid
PEA-1642Case Study: Energizing Atlantic Canada 05/15/2018 [475k]
GE Helps Nalcor Energy Build An Energy Corridor Moving More Power From Labrador to Newfoundland and Nova Scotia
PEA-0576Case Study: Jeju Island HVDC link II05/15/2018 [560k]
Case study on the 400MW HVDC project linking South Korea and Jeju Island
PEA-0571Case study: Lindome station HVDC case 05/15/2018 [801k]
Case study on the renewals of the HVDC link between Sweeden and Denmark
PEA-0568Case study: HVDCice case study 05/15/2018 [603k]
Case study on the solution for de-icing HVDC equipment
PEA-0580Case Study: Konti-Skan 1 HVDC05/15/2018 [713k]
Case study on the renovation and upgrade of the HVDC link at Kont-Skan pole 1
PEA-0567Case Study: Nelson River HVDC upgrade 05/15/2018 [1M]
Case study on the HVDC thyristor valve and control technology upgrades at Nelson River
PEA-0579Case Study: Rio Madeira HVDC link05/15/2018 [812k]
Case study on the 2,386 km HVDC transmission link in Rio Madeira
Rio-MadeiraCase Study: Rio Madeira HVDC Project Infographic05/15/2018 [1.8M]
Rio Madeira HVDC Project Infographic
PEA-0566Case Study: Sasaram HVDC project05/15/2018 [784k]
Sasaram HVDC project case study
PEA-0574Case Study: South West Link HVDC10/01/2015 [406k]
Case study on transmitting power and controlling the voltage with HVDC in Sweden
GCCIACase Study: GCCIA HVDC interconnection05/15/2018 [2.9M]
Case study on the GCCIA Phase 1 HVDC interconnection in the Gulf
KurukshetraCase Study: Kurukshetra UHVDC Project Infographic10/01/2015 [2M]
Infographic on the 3000 MW UHVDC transmission project at Kurukshetra
PEA-0560Case Study: What should it be? FACTS or HVDC?03/19/2018 [437k]
When energy network managers consider upgrading an alternating current transmission network, power electronics provide efficient solutions. This paper highlights considerations for selecting the optimum solution.

 